SERVING STATES EAST OF THE MISSISSIPPI

  • Drilled foundations from 3” to 12’ in diameter & up to 120’ Deep
  • Monopole & Self-supporting Cellular Tower Foundations
  • Limited Access Drilling & Low Clearance Drilling
  • Rock Coring
  • Underwater Caisson Drilling (Barge)
  • Bridge and Overpass Foundations
  • Mast Arm Lighting & Sign Foundations
  • Railroad Drilling

Precision Drilling’s experienced field staff includes over 30 skilled employees in areas of heavy equipment operation, heavy hauling, mechanical repair, welding, steel fabrication and general laboring. We supply and maintain all of our own drill rigs, dual rotary drives, cranes, boom trucks, air compressors and related equipment. Additionally, we provide a full line of services related to the industry such as fabrication and manufacturing of rebar cages, drill bits, augers, cleanout buckets and rock hammers. Our latest addition includes the manufacturing of our own dual rotary drives, allowing us to simultaneously advance casing while boring the hole. These drives provide a myriad of benefits such as reducing project completion time up to 50%, reducing associated costs, reducing the amount of equipment and workers required on site, elimination of hole collapse while drilling in compromising conditions, and a more predictable, uniform and stable foundation.

To see Our Fleet of Drilling Rigs

CLICK HERE!

Types of excavation include:
Dry Shaft Caissons
Wet Shaft Caissons
Rock Coring


Dry Shaft Construction

DryShaftConstruction

What is a Dry Shaft?
A shaft excavation that can be excavated to its designed depth without the need for slurry or casing.

When Is a Dry Shaft Used?

The dry construction method is used at sites where the ground water level and soil and rock conditions are suitable to permit construction of the shaft in a relatively dry excavation. and where the sides and bottom of the shaft may be visually inspected by the Engineer prior to placing the concrete.

The dry method is by far the least expensive method for drilled shaft construction.


Wet Shaft Construction

WetShaftConstruction

What is a Wet Shaft?

Often called the “slurry-method”, wet shaft construction is when a slurry or water is used to keep the hole stable for the entire depth of the shaft.

When is a Wet Shaft Used?
  • When a “dry” excavation cannot be maintained
  • When the existing soil is unstable and deforms or collapses
  • When loose material and accumulated water cannot be removed
Wet -vs- Dry
  • Wet is used when there is more than 12″ of accumulated water in the bottom of the shaft (typically)
  • Wet requires more Contractor expertise
  • Wet requires a need for specialized equipment
Wet Shaft Construction Process

Unlike the dry construction method, in this situation the water table may be above the shaft tip elevation or the geology consists of unstable or “caving” soils. Think of trying to dig a hole at the beach or lake near the water’s edge. The hole stays open until you reach or get just below the water table or waterline. Then what happens? It collapses.

Well the same goes for drilled shafts excavated below the water table or in unstable soils. During the drilling of the hole, a slurry is introduced that “stabilizes” the sides of the hole or casing is installed and prevents the soils from collapsing into the hole.

Upon reaching the designed shaft tip elevation, the hole is cleaned, then the rebar cage placed.

Unlike the dry shaft method, the concrete is being placed “under the water” and therefore a tremie is lowered into the hole and the concrete placed through the tremie, which is carefully removed a little at a time to avoid “breaching” the concrete.

Types of Wet Shaft Construction
The Static Process

  • Drilled down to the piezo metric level
  • Slurry introduced
  • Cuttings are lifted from the hole
The Circulation Process

  • Hole is drilled
  • Slurry level maintained at the ground surface
  • Cuttings and sand, is circulated to the surface, where it is cleaned and reintroduced down the hole.

 

Drilling with Slurry

Slurry is the fluid introduced into the excavation to assist in maintaining hole stability. Generally, three basic types of “slurries”, Mineral, Polymer and Water, are employed in drilled shaft construction.

What Does the Slurry Do?
  • Maintains a Stable Borehole Prior to Concreting
  • Maintains High Effective Stresses in the Soil while the Hole is Open (Retard Softening or Loosening)
  • Facilitates Removal of Cuttings in “Circulation Drilling”

In some instances, though not recommended, a blended slurry, consisting of mineral and polymer slurries is employed.

What does it Mean When a Shaft is “Cased”?

The casing method is often used either when shown on the plans or at sites when construction methods are inadequate to prevent hole caving or excessive deformation. In this method the casing may be either placed in a predrilled hole or advanced through the ground by twisting, driving or vibration before being cleaned out. Casings and liners play an important role in the construction of drilled shafts, and special attention must be given to their selection and use.

Casings are tubes that are relatively strong, usually made of steel, and joined, if necessary, by welding. Liners, on the other hand, are light in weight and become a permanent part of the foundation. Liners may be made of sheet metal, plastic, or pressed fibers. While their use is much less frequent than that of casings, liners can become important in some situations.

Common situations where casing is used are:
  • In generally dry soils or rocks that are stable when they are cut but which will slough soon afterwards. In such a case the borehole is drilled, and casing (a simple steel pipe) is quickly set to prevent sloughing.
  • When there is a clean sand below the water table underlain by a layer of impermeable limestone or low permeability clay into which the drilled shaft will penetrate. In this case, since the overlying sand is water bearing, it is necessary to seal the bottom of the casing into the underlying rock/soil to prevent flow of water and caving of soils into the borehole.

*Portions reprinted from the US Dept of Transportation – Federal Highway Administration.

Visit our other website
www.erricksonequipment.com
Click Here to view and print a Job Request Form.
Forms can be faxed to (908) 996-7211.